Conclusion
A production line that previously processed non-Halal ingredients is not an absolute barrier, provided cleaning is thorough and the changeover evidence chain is complete; acceptance is subject to the formal assessment of BPJPH and LHLN.
Key points
- The process remains four sequential stages: LHLN pre-check, document preparation and translation, LHLN internal review, and BPJPH final review and issuance.
- Cleaning evidence must cover the SOP and its execution records, cleaning-effectiveness verification, and first-batch confirmation after changeover.
- Equipment and piping that cannot be dismantled for washing need a described handling method, with replacement arranged where necessary.
- Documents and the site must match; auditors compare records with physical conditions, and gaps in the records are easily challenged.
- Changeover records must state the batch, time, operator and verification result so that they can be traced.
Documents to prepare
- Equipment list and production line layout
- Cleaning and sanitising work instructions with execution records
- Cleaning-effectiveness verification report and first-batch changeover records
Scope note
Whether it is acceptable, and the specific arrangements, are subject to the formal assessment of BPJPH and LHLN.