About the on-site audit
The on-site audit is a core part of certification
During the on-site factory audit for Indonesia BPJPH halal certification, an auditor visits the facility and checks sanitation, ingredients, production processes and staff cooperation against the submitted application documents, and records the findings.
This page organizes the key points into a preparation checklist, audit-day notes and a factory self-check table for the company to follow item by item. The audit conclusion is subject to the actual on-site conditions and the subsequent registration process.
Preparation checklist
Eight items to prepare, one by one
We recommend completing the checklist before the audit and reserving time for any rectifications
Clean the entire facility thoroughly
Cover the whole site with no blind spots:
- Warehouses: finished goods, semi-finished goods and raw materials sorted by category with no clutter
- Production workshops: floors, walls, workbenches, tools and equipment wiped thoroughly with no residue or stains
- Site grounds: floors kept clean and materials stacked in an orderly way
- Cross-contamination control: non-halal ingredients and products must be strictly separated from halal products
Verify ingredient information consistency
Make sure the ingredients declared in the application form and supplementary documents exactly match the ingredients actually stored in the warehouse, with no omissions or discrepancies.
Ensure relevant staff are on site
Staff from all departments should be present or designated duty staff should be available, so the auditor can understand each department’s work and promptly access the raw-material and finished-goods warehouses.
Keep normal production running on audit day
The audit focuses on production processes and techniques. The factory should operate normally on audit day so the auditor can observe the complete workflow from raw-material input to finished-product output.
Arrange a professional interpreter
Assign one interpreter who is familiar with the factory’s production processes and techniques, to avoid misunderstandings caused by inaccurate translation and keep communication efficient.
Know the audit sequence
The auditor typically follows the production line from the first process through to the finished product and asks production questions along the way; arrange specialists to accompany and answer throughout.
Keep the person in charge reachable
The factory manager’s mobile phone should stay on during the audit for timely communication and handling of unexpected situations.
Arrange transport for the auditor
On the audit day, arrange vehicle transfers for the auditor (for example, airport to factory and factory to accommodation).
Audit-day notes
Four things to assign on the day
These points are already included in the checklist above; assign an owner for each on the day
Normal production
Schedule production so the full process and live products can be observed.
Checklist item 4Interpreter
An interpreter familiar with the process attends all day; align terminology in advance.
Checklist item 5Key contacts
The manager stays reachable and each area has a contact person.
Checklist item 7Transport
Confirm flights, accommodation and pickup vehicles with travel time reserved.
Checklist item 8Factory self-check table
Run through it once before the audit
You can print this table and have each area owner confirm and sign the items
| Area | Key point | Done |
|---|---|---|
| Warehouses | Finished goods, semi-finished goods and raw materials sorted and zoned with clear labels and no clutter | |
| Production workshops | Floors, walls, workbenches, tools and equipment clean with no residue or stains | |
| Site grounds | Roads and stacking areas tidy; goods stacked in order | |
| Segregation | Non-halal materials and products strictly zoned from halal products; cross-contamination controls in place | |
| Ingredient check | Declared ingredients match physical stock and labels in the warehouse, with no omissions or discrepancies | |
| Staff on site | Department heads or duty staff confirmed, each aware of their cooperation tasks | |
| Production on the day | Normal production is scheduled so the full process can be demonstrated | |
| Interpreter | An interpreter familiar with the process is confirmed and briefed on workflow and terminology | |
| Communication | Phone numbers of the manager and contact persons are compiled and stay reachable on the day | |
| Logistics | Pickup vehicles, itinerary and accommodation information confirmed |
Category-specific audit focus
What the on-site audit looks at in Shandong industry belts
The same checklist lands very differently on seafood, peanuts and nuts, sauces, beverages and dairy, and personal care and packaging
Seafood & prepared foods
Review thawing and receiving records, zoning between seafood and auxiliary materials, ingredient labels on batter and sauces, cleaning of shared equipment for surimi and prepared meats, and freezer and cold-store temperature records.
Peanut & nut products
Review oil change and sourcing for roasting and frying, dosing records for seasoning powders and antioxidants, dust and pest control in roasting workshops, moisture-proof storage and lot marking.
Condiments & compound sauces
Review the source of brewing cultures and hydrolysed vegetable protein, ingredient verification for flavours and thickeners, cleaning validation for fermentation tanks and transfer piping, and residue control on filling lines.
Beverages & dairy
Review flavour solvent and emulsifier sourcing, CIP parameter records, culture management, zoning between allergens and non-halal materials, and marking at filling and packing.
Personal care & packaging
Review glycerine, surfactant and enzyme sourcing, dosing records for processing aids, migration test reports for food-contact materials, and segregation of packaging storage and regrind.
Shared lines and warehousing
Review changeover sequence, cleaning and verification records, dedicated utensil marking, physical segregation in storage and stock-in/out records; all should be retrievable on site on the audit day.
Coordination with the port after the audit
Once certificate details are confirmed, product names, production-site information and packaging marks are checked against the actual shipment via Qingdao, Yantai, Rizhao, Lianyungang, Shanghai, Ningbo or Xiamen Port, with support for forwarders and importers on clearance documents.
Qingdao visits and plant coaching
Pre-audit self-checks can be booked across Qingdao districts; Yantai, Weifang, Weihai and Rizhao are covered by scheduled plant visits; companies in Lianyungang, Shanghai, Ningbo and Xiamen can first align documents online, then arrange on-site coaching around the audit schedule.
Audit travel basis
Transport, accommodation and related travel for auditors visiting the factory are settled at actual cost; together with the official BPJPH fee and the LHLN review fee, the overall fee composition is subject to the formal assessment.
Reminders
- We recommend completing all preparations 3–5 days before the audit to leave time for possible rectifications.
- A pre-audit coaching session is available, where our consultants review documents and site conditions in advance.
- If you have any questions while preparing, contact us for one-on-one audit preparation guidance.
Related services and information
Qingdao-based halal certification service, starting with an eligibility assessment
An LHLN body under mutual recognition agreement with Indonesia's BPJPH, providing bilingual document preparation and on-site audit coordination. Fees and timelines are confirmed in the formal assessment.