Conclusion
The audit centres on whether segregation is real and whether records match, not on the thickness of the document file. Where process water or steam contacts the product, explain how it is treated to introduce no prohibited material.
Key points
- Raw material, finished goods and non-conforming goods warehouses must be zoned and labelled to prevent mixing.
- Production lines should be dedicated where possible, and shared equipment needs changeover deep-cleaning records and verification of cleaning effectiveness.
- Cleaning tools, transfer containers and workwear must be colour-coded.
- SOPs, HACCP and the traceability matrix must map onto actual practice, as auditors may question line staff at random.
- Pest and foreign-body control: these are baseline items, and missing records affect the overall on-site impression.
Documents to prepare
- Plant layout and production line drawings
- Changeover cleaning work instructions and execution records
- Traceability matrix and batch production records
- Staff Halal awareness training records
- Pest control and foreign-object control records
Scope note
The specific audit checklist is subject to the formal assessment of LHLN and BPJPH.