Conclusion
Audit preparation centres on physical segregation and traceable records; patching documents at the last minute will not pass an on-site check. Warehouse temperature and humidity plus pest control are also reviewed, and missing records affect the conclusion.
Key points
- Warehouse zoning: store raw materials, finished goods and non-conforming goods in separate zones with clear signage.
- Line changeover: where sieving, roasting and grinding share lines, define cleaning requirements and keep records.
- Utensil control: colour-code cleaning tools, transfer containers and workwear.
- Operational documents: SOPs, the traceability matrix and training records must map to actual practice on site.
- On-site questioning: auditors often ask line staff at random to confirm the Halal requirements are genuinely implemented.
- Environment control: warehouse temperature and humidity records and pest control measures are also reviewed, and gaps affect the on-site conclusion.
Documents to prepare
- Plant layout and production line drawings
- Process flow chart
- Changeover cleaning work documents and records
- Traceability matrix and staff training records
- Warehouse temperature and humidity records and pest control logs
Scope note
The specific audit checklist is subject to the formal assessment of LHLN and BPJPH.