Conclusion
A new production line is a change to the information stated on the certificate and should go through the amendment process first, rather than being deferred to renewal.
Key points
- The certificate is bound to the formula, factory address and production line; a change of line or key equipment affects the valid scope.
- The correct order: submit the amendment and accept the necessary checks, then enter renewal after it is completed.
- The annual audit looks at whether changes were declared promptly, the formula updated, and records kept continuous.
- Spacing the amendment and the renewal apart is more manageable than filing both together.
- Entering renewal after the amendment is completed keeps the two sets of materials from pulling against each other.
- If the new line involves a new product category, an added-product filing may also be needed; trial batches during expansion must enter the record system.
Documents to prepare
- Current certificate and validity details
- Equipment list and layout drawing for the new line
- Amendment application materials and self-check records
- Cleaning and batch traceability records
- Trial production and validation records for the new line
Scope note
Whether the amendment and renewal are accepted, and the arrangements for them, are subject to the formal assessment of BPJPH and LHLN.