Conclusion
Sharing the plant is acceptable, but physical segregation and changeover cleaning records must withstand on-site checking. The zoning plan should appear on the layout drawing and be verifiable on site.
Key points
- Warehouse zoning: separate and label raw material, finished goods and non-conforming goods to prevent mixing.
- Equipment: dedicated Halal lines are preferred; shared equipment needs changeover cleaning records and verification of cleaning effectiveness.
- Utensils: colour-code cleaning tools, transfer containers and workwear; cross-use is not acceptable.
- Documents: SOPs, HACCP, the traceability matrix and training attendance must be retrievable on site.
- Frying and seasoning-coating stages leave residues, so they are usually examined closely.
- Where the two lines share a changing room or sanitising facility, explain the staggering and the cleaning handover.
- Weighing tools, scoops and containers in the dosing area should be line-dedicated or have a clear handover.
Documents to prepare
- Plant layout and production line drawings
- Changeover cleaning work instructions and execution records
- Batch traceability records
- Staff Halal awareness training records
- Use schedules and handover records for shared facilities
Scope note
The specific audit checklist is subject to the formal assessment of LHLN and BPJPH.