Conclusion
Sharing equipment is acceptable, but records must prove that changeover cleaning is effective and that batches do not cross over. For parts that are hard to dismantle and clean, consider dedicated equipment.
Key points
- Changeover cleaning records should show steps, the person executing them, time, and verification of cleaning effectiveness.
- Production scheduling and batch sequencing records must demonstrate the independence of Halal batches.
- Raw material, finished goods and non-conforming goods must be zoned and labelled.
- Staff operating and Halal awareness training records must be retrievable on site.
- Equipment that cannot be cleaned thoroughly, or shared piping, should be dedicated or resequenced.
- Drying shrimp skin runs continuously, and material builds up on inner walls and the conveyor, so cleaning must cover these parts.
- If non-Halal products contain animal or alcohol components, schedule Halal batches first to cut residue risk.
Documents to prepare
- Equipment list and a statement of shared use
- Changeover cleaning records and verification reports
- Production schedule and batch traceability records
- Plant layout and training attendance records
- Cleaning verification records for inner walls and the conveyor
Scope note
Specific audit requirements are subject to the formal assessment of LHLN and BPJPH.