Indonesia BPJPH Halal · Good Fortune (Qingdao) LHLN Certification Service

Factory & Audit FAQ #43

Our infant formula plant in northern Jiangsu uses outsourced packing. How will the auditor examine the subcontracted step during the site audit?

Quick answer

Bottom line: outsourced packing is not automatically unacceptable, but the subcontractor must be brought into the same Halal control chain. The auditor will normally follow the traceability records to check three things: whether the subcontractor is declared in the certificate or amendment documents; whether the subcontractor's line is dedicated, and where shared, whether changeover cleaning records exist; and whether changeover and line-clearance records are complete and traceable. Qualification documents and batch handover records from the subcontractor must also be available, so that raw material to finished goods can be matched one to one. If the subcontracted step is undeclared, the certified scope does not match actual production, which is riskier than rectifying your own line.

Conclusion

Outsourced packing does not automatically mean non-compliance, but the subcontractor must be brought into the same Halal control chain. Include the subcontracted step in the certified scope at filing.

Key points

  • Whether the subcontractor is declared in the certificate or amendment documents.
  • Whether the subcontractor's line is dedicated, or where shared, whether changeover cleaning records exist.
  • Whether changeover and line-clearance records are complete and traceable.
  • Whether the subcontractor's qualification documents and batch handover records are complete and can be matched one to one.
  • An undeclared subcontracted step means the certified scope does not match actual production, which is riskier.
  • Halal requirements for the subcontractor should be written into the contract to define each side's responsibility.
  • The subcontractor's site faces Halal document and practice checks, and batch destinations must be traceable.

Documents to prepare

  • Contract and qualification documents with the subcontractor
  • Declaration or amendment documents for the subcontracted step
  • Changeover cleaning and line-clearance records
  • Batch handover records from raw material to finished goods
  • The subcontractor's site layout and lines

Scope note

Whether the subcontracted arrangement is acceptable is subject to the formal assessment of LHLN and BPJPH.

Further Reading

Preparation steps behind this answer

Documents

File formulations, raw-material lists, supplier qualifications and lot records product by product so the evidence mentioned in the answer can be matched one to one.

Site

Check changeover sequence, cleaning records, dedicated utensils and warehouse zoning for shared lines, and keep photos and records together.

Shipment

Check certificate details and packaging marks against the actual shipment via Qingdao, Yantai, Rizhao, Lianyungang, Shanghai, Ningbo or Xiamen Port.

Fees

Fees consist of the official BPJPH fee, the LHLN review fee and on-site audit travel; amounts and timing are subject to the formal assessment.

Ask a consultant about this question

Qingdao-based halal certification service, starting with an eligibility assessment

An LHLN body under mutual recognition agreement with Indonesia's BPJPH, providing bilingual document preparation and on-site audit coordination. Fees and timelines are confirmed in the formal assessment.

Call the Hotline