Conclusion
Renewal is not a simple extension; it reviews how the system performed during the validity period, while the annual audit confirms the system is still being followed. Both are subject to the formal assessment of BPJPH and LHLN.
Key points
- Begin renewal preparation well before expiry to avoid a gap in certificate validity.
- Changes to the formula, address, production line or certificate holder during the validity period must be declared first, or renewal will require corrections.
- Renewal and the annual audit both sample system documents against actual records.
- Some categories require an on-site check, which must be coordinated with production scheduling.
- Pastry has a higher moisture and fat content, so renewal should also update the validation of shelf life and storage conditions.
Documents to prepare
- The existing BPJPH certificate and its validity details
- Annual internal audit report and corrective action records
- Cleaning and sanitation records and batch production records
- Formula update log and change declaration documents
- Supplier evaluation and incoming acceptance records for this cycle
- Receipt or acknowledgement of the change declaration
Scope note
Specific renewal and annual audit requirements and outcomes are subject to the formal assessment of BPJPH and LHLN.